Best Bathtub Replacement Companies: How To Choose the Right Pro

August 15, 2025 - Mau Mendoza

Bathroom Best Bathtub Replacement Companies: How To Choose the Right Pro

If you’re searching for the best bathtub replacement companies, you’re likely weighing speed, durability, accessibility, and cost. The right team will guide design, manage the remodeling process, and deliver a watertight fit that resists mold and mildew—without surprise add-ons.

This guide shows what to look for in a contractor, which materials make sense, and how pricing works, so your bath remodel finishes on time and on budget.

How To Compare the Best Bathtub Replacement Companies

Choosing a company is about process and protection, not just a low bid. Start by confirming license, insurance, andEPA Lead-Safe Certification for pre-1978 homes. Ask how the installation team handles demolition, plumbing setbacks, and wall prep before new wall surrounds or shower walls go in. 

Strong customer service includes clear design consultations, line-item labor costs vs. materials costs, and written cleanup/warranty steps. If accessibility is a goal, confirm experience with ADA upgrades such as grab bars, nonslip flooring, accessible seating, and walk-in tubs or walk-in showers. 

For quick refreshes, discuss tub-to-shower conversion, shower remodel, or bathtub installation using acrylic panels or a shower kit.

Materials and Configurations (What You’ll Live With Daily)

Tub & Wall Materials at a Glance

Acrylic tubs + acrylic wall panels

Shines for: Fast refresh, seamless look
Pros: Light, warm to the touch, wide style range; compatible with shelves/caddies
Watch-outs: Can scratch; verify panel thickness, solid backing, and sealed seams.

Fiberglass (FRP) tubs

Shines for: Budget updates
Pros: Affordable, easy handling, and installation
Watch-outs: Gelcoat can dull; requires a flat, well-supported base to prevent flex.

Enameled steel (porcelain-on-steel)

Shines for: Classic, glossy look
Pros: Hard, durable surface; cleans easily
Watch-outs: Heavier than acrylic; can chip if struck; may feel cooler to the touch.

Cast iron tubs

Shines for: “Forever” tubs with excellent heat retention
Pros: Extremely durable and quiet
Watch-outs: Very heavy—confirm floor structure; allow ~$300–$800 if reinforcement is needed.

Composite (e.g., Vikrell) tub/shower units

Shines for: Lightweight, integrated systems with quick installs
Pros: One-manufacturer system; smooth, high-gloss finish; common in alcove replacements
Watch-outs: Follow maker’s support and fastening specs (varies by unit).

Bath liner over existing tub

Shines for: Minimal disruption, 1–2-day turnarounds
Pros: Covers stains/cracks without full demo
Watch-outs: Prep must avoid moisture traps; confirm ventilation plan and warranty terms. (Prices vary widely by system and customization.)

Comfort & Performance Upgrades

Specify massaging jets, waterproof doors on select walk-in models, andhigh-performance showerheads. If water quality is a concern, add a compatible whole-house or point-of-use filter. Insulate the tub cavity and apron (e.g., spray foam around the skirt) to quiet plumbing and hold heat longer.

Vent outdoors and size fans to ≥50 CFM intermittent or ≥20 CFM continuous (ASHRAE 62.2 / IRC M1507). Pair with WaterSense showerheads (≤2.0 gpm). 

What Affects Cost and Timeline (Beyond the Sticker Price)

Most bathtub replacements cost around $5,700 to $6,000 on average, with a typical range of $2,000 to $10,500, depending on material and scope.

Regional benchmarks (apply to quotes, not list prices):

  • Coastal/urban: often around 10% to 20% (higher price levels and trade wages).
  • Inland/suburban: around baseline.
  • Rural/non-metro: Around 5% to 10% lower (lower wages), but travel/logistics can offset.

Key cost drivers specific to bathtub replacement

  • Scope: Straight swap vs. tub/shower combo upgrade vs. tub-to-shower conversion or full bath remodel.
  • Structure & plumbing: Subfloor/framing repair; new mixing valves; moving drains/risers; heavy tubs may require reinforcement (around $300–$800).
  • Materials & lead time: Cast iron/stone and custom surrounds add weight, coordination, and freight.
  • Accessibility: Blocking for grab bars, low thresholds, and seating (use ADA dimensions as a design reference, even when not required).
  • Disposal & logistics: Demo, haul-off, elevator access (urban), or long travel (rural).
  • Permits/inspections: Plumbing/electrical changes usually require permits (IRC R105). Your installer should handle approvals.
  • Health & safety (older homes): For pre-1978 paint, hire EPA Lead-Safe Certified pros (RRP Rule).

Typical bids separate materials cost (tub, wall surround, trim) andlabor costs (demo, plumbing, setting, finishing). For multi-trade jobs, many firms offer bundled remodeling services to streamline scheduling.

Typical timeline for is like-for-like swap is about 1 to 2 days with a pro; add time for plumbing moves, substrate repair, tile work, or condo/HOA scheduling.

Waterproofing reminder (tub-shower surrounds): Use an approved backer (cement or glass-mat) with a bonded waterproof membrane (ANSI A118.10). Water-resistant gypsum “greenboard” is not permitted in direct wet areas by modern code limitations (see R702.3.7/.7.1 guidance used by many jurisdictions).

FAQs

Is a tub-to-shower conversion faster than replacing like-for-like?

Usually, yes—especially with prefab pans and acrylic panels—but tile layouts or plumbing moves can extend time.

What if mobility is a concern?

Ask for ADA upgrades: low-threshold entries,grab bars, accessible seating, andnonslip flooring. Many solutions are compatible with walk-in tubs or curbless showers.

Do I need a full remodel to stop mildew?

Not always.Proper ventilation plus non-porous surrounds and sealed seams often solve recurring mold and mildew without gutting the room.

Find the Best Bathtub Replacement Companies Near You

Ready to plan with confidence? Mr. Remodel connects you with vetted local pros for bathroom remodeling, from bathtub replacement and tub-to-shower conversion to accessibility upgrades. Share your project size, timeline, and style, and we’ll match you with contractors who provide clear scopes, fair pricing, and clean workmanship from demo to final wipe-down.